7.In the summer of 2001, the structure was then dismantled and transported on 35 lorries to Falkirk, before all being bolted back together again on the ground, and finally lifted into position in five large sections by crane.
在2001年夏天,整套建筑又被拆解成零件,用35辆货车运到福尔柯克,在那里重新组装成五大部分,最后用吊车升起来安装完毕。