It includes the division of dissolving area, the redetermination of its length and width,downhill layout of dissolving area a nd improvement of drilling tunnel and cutting grooves.
包括溶区,溶区长、宽重新定;溶区间下山,及打眼巷、切割槽改进等。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。