The Northern Section of the Tai Lam Tunnel extends from Chainage 18+212 to 21+518, as shown on Figure A.
图A所示,大榄隧道北段链距由18+212延展至21+518。
The Northern Section of the Tai Lam Tunnel extends from Chainage 18+212 to 21+518, as shown on Figure A.
图A所示,大榄隧道北段链距由18+212延展至21+518。
The applied Q sign in the "Discharge"- or "Q-dH-curve"- fields controls the pump direction (with or against chainage).
设置了泵以后,当泵执行操作时,从此位置总共流向游的总的流量也即泵的出流量。
声明:以上例、词性分类均由互联网资源自动生成,部分人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。