dam-foundation seepage is mainly of grike seepage, and there is little cave like a string of beads in the local area, suggesting that it is necessary to carry out grouting gallery.
坝基渗以岩溶裂隙性渗,局部有串珠状小容洞渗,建议进行防渗帷处理是必要的。
dam-foundation seepage is mainly of grike seepage, and there is little cave like a string of beads in the local area, suggesting that it is necessary to carry out grouting gallery.
坝基渗以岩溶裂隙性渗,局部有串珠状小容洞渗,建议进行防渗帷处理是必要的。
声明:以上例句、词性分类均由资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。