On May 9, 2008, Our company signed the three stages of raw materials general engineering contracts of Indan JSW project with China Shougang International Trade &Engineering Corp.(CSITEC).
2008年5月9日,我司与中国首钢国际贸司签署印度JSW司三期原料总包同。
On May 9, 2008, Our company signed the three stages of raw materials general engineering contracts of Indan JSW project with China Shougang International Trade &Engineering Corp.(CSITEC).
2008年5月9日,我司与中国首钢国际贸司签署印度JSW司三期原料总包同。
2008年5月9日,我司与中国首钢国际贸司签署印度JSW司三期原料总包同。
On May 9, 2008, Our company signed the three stages of raw materials general engineering contracts of Indan JSW project with China Shougang International Trade &Engineering Corp.(CSITEC).
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。