1.The new finding of two beds quartzitic conglomerate in the Ertix piedmont is sedimentary response with Altay nappe structure.
额尔齐斯山前地带新发现两套石英砾岩,是阿尔泰推覆构造沉积响应。
2.The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe.
摘要通过埋设软体排上原形观测仪器,对防浪围堤抛石施工过进行了全监测。
3.10.basement and unmetamorphosed terrigenous shallow carbonate rock in the Austria Alps -South Alps obduc-tion nappe and radiolarian silicalite in fault basins.
4.The styles of the detachment structure are short antiform and synform structure mainly, and dome structure, nappe outlier and nappe tectonic window too.
滑脱断裂构造样式,以短轴背形、向形构造为主,另有穹窿构造、滑来峰构造、滑覆窗构造。
5.The project department monitors and controls the whole process of breakwater enrockment costruction by field observing instruments buried in sand soft nappe.
通过埋设软体排上原形观测仪器,对防波堤抛石施工过进行了全监测。
6.The central nappe zone is divided into seven nappes, which have an appearance of horizontal scaly imbrication and vertical thruSt overlap,and thus form a seometric model of scaly imbrication.