According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针高炉WZ-C无料钟炉顶装料设备存在的布料器温度高、水等问题进行了原因分,并进行水冷、水封系统改进。
According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针高炉WZ-C无料钟炉顶装料设备存在的布料器温度高、水等问题进行了原因分,并进行水冷、水封系统改进。
The maximum depth of the pit is mainly related to the inflow angle, unit discharge and the perviousness of the dike etc. with the maximum impact from the Unit discharge.
水桩坝的坝前最大坑深度主要与来流单宽流量、入流角、桩坝水率等因素有关,其中单宽流量坑深度的影响最大。
声明:以上例句、词分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。