The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
其基本原理为:矿级配中粗成的孔隙率细、填、沥青和预孔隙率填充。
The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
其基本原理为:矿级配中粗成的孔隙率细、填、沥青和预孔隙率填充。
声明:以上例句、词性分类联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。