In this paper, the limit is broken through and a more general necessary and sufficient condition for schedulability is proposed.
突破这一限制,提出了更具一般的可调析判定充要条件。
In this paper, the limit is broken through and a more general necessary and sufficient condition for schedulability is proposed.
突破这一限制,提出了更具一般的可调析判定充要条件。
声:以上例句、词类联网资源自动生成,部未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。