After the discrete model of MLI has been built, the dynamic programming was applied to develop the suboptimum algorithm to achieve the optimum aim.
讨论了法中参数选择对误差影响,对法杂度分析表明其与优化问题规模增长一阶关系。
After the discrete model of MLI has been built, the dynamic programming was applied to develop the suboptimum algorithm to achieve the optimum aim.
讨论了法中参数选择对误差影响,对法杂度分析表明其与优化问题规模增长一阶关系。
The constructed solving process is to establish a general SBR model firstly, then to derive the suboptimum solution by trial and error method with the help of simulation tools.
所构造法首先建立通用序批式反应器模型;然后借助仿真工具试差求取次优。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。