It includes the division of dissolving area, the redetermination of its length and width,downhill layout of dissolving area a nd improvement of drilling tunnel and cutting grooves.
包括划分,长、宽重新确定;下山布置,以及打眼巷、切割槽改进等。
It includes the division of dissolving area, the redetermination of its length and width,downhill layout of dissolving area a nd improvement of drilling tunnel and cutting grooves.
包括划分,长、宽重新确定;下山布置,以及打眼巷、切割槽改进等。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。